The Kalkandere Hydroelectric Project consists of the construction of a greenfield one weir and two run-of-river hydroelectric power plants located in the Iyidere river basin, in Turkey’s Eastern Blacksea Region. Total installed capacity of the project will be 43,47MWm / 42,33MWe. The plant has been designed to generate electricity by utilizing the 100.2 m of head between the tailwater level of the upstream existing Cevizlik HEPP and the Incirlik HEPP project which is under project stage and will be located downstream.