Project keyVCS-823Project descriptionThe project utilises the hydrological resources of the Datong River through construction of a run-of -river hydro project to generate zero emissions electricity for the local power grid. The plant is composed of a concrete gravity dam, release sluice, channels, power house and switch station. The annual power generation is expected to be approximately 212,000MWh.