Project keyVCS-817Project descriptionThe project will utilize the hydrological resources of the Datong River through construction of a run-of river hydro project to generate zero emissions electricity for the local power grid. The hydro-power plant is composed of a concrete gravity dam, release sluice, channels, and powerhouse and switch station.