Guangdong Huizhou LNG Power Generation Project

Guangdong Huizhou LNG Power Generation Project

Other

Verified project

Project details

Project key
VCS-722
Methodologies
AM0029
Project description
Huizhou LNG Power Generation Project (HLPGP) has constructed a highly efficient Natural Gas (NG) fired Combined-Cycle Gas Turbine (CCGT) power plant. The proposed project has a capacity of 1083.09 MW (3¡Á361.03 MW) with annual output of 3703.5 GWh. All three units are now in operation. The proposed project will have an annual consumption of 506,100 tons of Liquefied Natural Gas (LNG), which will be regasified at the LNG terminal and transport to the power station via pipeline. Electricity to be generated by HLPGP will be subsequently supplied to the Guangdong Provincial Power Grid (GPPG), which is a part of the Southern China Power Grid (SCPG), consequently displacing power generation from the Southern China Power Grid (SCPG) where more than 50 percent of the power comes from coal fired power plants.

Metadata

Registered on
6/17/2023
Last updated
6/17/2023