Duzce Aksu Hydro Electricity Power Plant

Duzce Aksu Hydro Electricity Power Plant

Renewable Energy

Verified project

Project details

Project key
VCS-2095
Methodologies
ACM0002
Project description
The purpose of the proposed project activity is to generate renewable electricity to be delivered to the Turkish National Power Grid by utilizing water resources. The project activity is located at the Golyaka Town, Duuzce Province, Turkey. The total installed capacity of the Project is 46.2 MW. The electricity is going to be produced without causing airborne pollutants or Green House Gas (GHG) emissions. The construction and operation of the Duzce Aksu Hydro Electric Power Plant (HEPP) will be delaying the addition of conventional thermal power plants to the Turkish National Electricity Grid.

Metadata

Registered on
6/17/2023
Last updated
6/17/2023