Project keyVCS-1310Project descriptionThe project generates renewable power electricity by using the wind power resource, and supplies electricity to Northeast China Power Grid (NECPG) replacing fossil fuel consumption and thus reducing GHG (CO2) emissions. It involves installation and operation of 33 wind turbines with the unit capacity of 1,500 kW and total capacity of 49.5 MW. It is estimated that the annual generation of the proposed project will be 108,830MWh once fully operation, with a plant load factor of 25.1%. The project lifetime is 21 years (including 1 year construction period).The electricity currently generated by the Grid is relatively fossil fuel intensive, with a combined margin emission factor of 1.0280 tCO2/MWh. The proposed project is therefore expected to reduce emissions of GHG of 111,877 tCO2e per year during the first crediting period by displacing electricity from NECPG.